Following severe flooding and erosion along US Highway 2 in Tumwater Canyon near Leavenworth, Washington, Pipkin Inc. was contracted to perform emergency roadway repairs at 17 locations with varying degrees of damage. Four of these locations required complete reconstruction of the roadway subgrade and driving lanes. The project demanded rapid mobilization and extensive coordination of personnel, equipment, materials, and subcontractors to restore this critical transportation corridor under an accelerated schedule during winter months.

Pipkin's work included extensive excavation, embankment reconstruction, slope stabilization, and roadway restoration. Major material quantities included 8,000 tons of quarry spalls, 8,000 tons of riprap, 10,000 tons of crushed surfacing base course, and 18,000 tons of crushed surfacing top course. Through coordinated construction efforts and efficient resource management, Pipkin helped restore safe passage through Tumwater Canyon, reopening US 2 to two-way traffic more than a month ahead of schedule.

Artboard 1.png

Location:

US Highway 2

Artboard 2.png

Owner:

Washington State Department of Transportation

Artboard 3.png

Engineer:

Washington State Department of Transportation

Artboard 4.png

Status:

Completed in 2026