Priest Lake Dam
Pipkin Inc. served as a subcontractor on the Priest Lake Outlet Dam Improvements Project for the Idaho Water Resource Board, completing the final phase of modifications to the outlet dam at the south end of Priest Lake. Pipkin’s scope included earthwork, cofferdam construction, dewatering, temporary bridges, and armor stone placement in support of raising the dam’s 11 outlet gates by six inches and the structural modifications that went with them.
Construction took place during winter months, working through cold-weather conditions and in-water work on an active dam that controls flow into the Priest River. The completed improvements give the state more flexibility to hold summer lake levels while providing more flow for the river and fish downstream.
Location:
Priest Lake, WA
Owner:
Idaho Department of Water Resources
Engineer:
Mott MacDonald
Status:
Completed in 2024